Session summary · 2026-05-25 (Monday)

Today, in one page

Everything we discussed, did, and lined up for next session. Designed for iPad — open this whenever you want to reorient without re-asking.

Phase 35 fully shipped + iPad-tested + bug-fixed V2 pitch deck built Phase 36 scoped (8 plans) Pushed to GitHub
22
Git commits today
5
New mockup HTML files
12
Mobile screengrabs taken
10/11
Audit issues fixed

What we did today

1

Shipped Phase 35 — International Neighborhoods + Vesta + WC Hub

6 plans executed across 5 waves with worktree-isolated parallel agents. Added Paris, Tokyo, Buenos Aires, Cape Town, and Vesta (fictional war-affected city) to the selectable cities. Built the World Cup 2026 hub. Updated the demo script with the Vesta closing beat.

8 active places All gates green SUMMARY.md per plan
2

Locked autonomous-execution mode

Founder direction: skip mid-phase review checkpoints, review everything at end of phase only. Flipped plans 04/05/06 from `autonomous: false` → `true`. Same direction locks Phase 36.

3

14 World Cup concepts brainstormed (founder flagged the hub was "boring")

Generated and mocked-up 14 distinct WC hub concepts across 5 themes (Hyperlocal, Cross-city, Tourist+Diaspora, Business+Commerce, Civic+Cultural). Founder said "I love it all" — all 14 will be absorbed into a sectioned WC Hub V2 in Phase 36.

Open the 14-concept gallery →
4

Vesta tone shift — went harder-hitting per founder direction

Plan 04 used dignified euphemisms (D-11). Founder said "go harder." Wrote 5 new Vesta posts using shelter-in-place / bomb shelter / attack / aid coalition / missing-person-found-after-attack vocabulary. Still fictional (no Ukraine/Gaza/etc.). 8 original posts kept as civic-vitality counterweight per D-09 mixed tone.

Open the kept-vs-added diff →
5

Cross-city consistency audit — 11 issues found, 10 fixed

Explore agent crawled the codebase. Found: city pick didn't persist across reload, briefing subtitle hardcoded WB, Emma Chen showed in every city, feed listings WB-only, calendar fallback WB, hotspot reports defaulted to WB coords, plus more. All committed atomically with conventional messages.

6

iPad walk-through + 6 more bugs fixed

You walked through the live app on iPad. Found 8 more issues: onboarding city pick didn't propagate (race condition), urgent banner stacked all cities, feed inserts (listings + nurturing + social nudges + new neighbors) still WB. All 6 fixable issues shipped. 2 parked: calendar polish (Phase 36) + story bubbles (next session discuss).

7

12 mobile screengrabs captured via Playwright

Set up headless Chromium at iPhone 14 Pro viewport (393×852). Captured Williamsburg, Vesta red banner, Tokyo, Paris, BA, Cape Town, selector dropdown, WC hub drawer, Vesta + Tokyo briefings, BA calendar. PNG output at pitch/deck-assets/. Script lives at scripts/take-deck-screenshots*.mjs for re-capture.

8

Pitch deck V2 built — strategic acquisition framing + 12 mobile screengrabs

Deep research on M&A pitch deck best practices. V1 deck untouched as rollback. V2 (20 slides) adds: 4 product-proof slides with screengrabs, Vesta beat slide, cross-city WC beat slide, RESHAPED moat (honest "zero users by design" framing), Strategic Fit Map (Compass-has vs Nabe-brings), Revenue Levers for Compass (quantified accretion math), What This Defends Against (Zillow threat), Day 1/30/90/Year 3 integration timeline, Honest Risks + What I Won't Do, explicit Ask with anchor numbers.

Open V2 deck →
9

WC Hub V2 mockup — all 14 concepts absorbed

Multi-section drawer with all 14 ideas grouped into 6 themed sections (Hero / Happening Now / Hyperlocal / Cross-city / Tourist+Diaspora / Cultural). Keeps Option A entry (pinned card in Right Now banner — already shipped). Borrows Option C's "inline section with horizontal cards" feel for the drawer interior. Vesta gets full-width hero in Cultural section.

Open WC Hub V2 mockup →
10

Pushed to GitHub — `pitch` branch now lives on remote

First push of the pitch branch to origin. RPC initially failed (large payload, 249 commits ahead of main), succeeded with `http.postBuffer=524288000`. Branch tracks `origin/pitch` for future pushes.

View pitch branch on GitHub →

What we decided

Autonomy
All future phases run autonomous
Plans no longer have `autonomous: false` checkpoints. Founder reviews everything at end of phase. Saves session count.
Vesta tone
D-11 dignified-euphemism rule overridden
Hard-hitting vocabulary allowed: shelter-in-place, bomb shelter, attack, aid coalition. Still fictional (no real-war proper nouns).
Deck V2 — Day 30 markets
NYC + LA + Austin (3 pilot markets)
Day 90 expansion: SF + Boston + Miami. Compass-strong + social-savvy markets.
WC Hub V2 design
Option A entry + Option C interior
Pinned card in Right Now (Opt A) → opens a sectioned drawer with horizontal card rows (Opt C feel). All 14 concepts absorbed.
Phase 36 scope
Bundle 6 upgrades into one phase
US expansion + WC Hub V2 + photo threading + calendar polish + palette refresh + photo audit. 8 plans total.
Palette direction
Variant C (midnight-purple → black)
Plus per-city accent colors so switching cities is visually exciting. Premium / tech / sophisticated feel.

App changes shipped today

visible on the live app at port 5173
  • City pick persists across reload via localStorage
  • Onboarding city pick propagates to active state (no more landing on WB after picking Tokyo)
  • Emma Chen (Featured Agent) hidden in non-NYC cities
  • Per-city briefings — 8 hand-tuned briefings (Métro alerts in Paris, Yamanote delay in Tokyo, shelter-in-place in Vesta, etc.)
  • Briefing subtitle shows active city name (not "Williamsburg")
  • Calendar subtitle + filtering per city
  • 5 international + Vesta hotspots added — red urgent banner now populates for high-urgency cities
  • 5 hard-hitting Vesta posts + 2 new Right Now alerts (shelter-in-place + aid convoy)
  • SocialNudgeCards ("Happening Tonight") now per-city — pulls from briefing data
  • NurturingStrip ("new here guide") gated to NYC only
  • Feed listings filter by active city (no more WB listings in Tokyo)
  • PostLocationMiniMap extended to 8 keys (fixed build break)
  • Hotspot report fallback hardened (was silently using WB coords)

Phase 36 — what's planned for next sessions

8 plans across 5 waves · ~16-25 hours total
Plan What Theme
36-01 US pilot expansion — add LA + Austin (Day 30 deck pilot markets) scale
36-02 Palette refresh + per-city accents — Variant C (midnight-purple → black) + unique color per city brand
36-03 WC Hub V2 mock data scaffold — extend mockWorldCup.ts with per-section sub-arrays WC hub
36-04 WC Hub V2 sectioned drawer build — hero + 5 sections + 14 feature cards + Vesta full-width hero WC hub
36-05 Photo threading types + mock data — extend Post type, contributor photos live coverage
36-06 Photo threading UI + UserProfile — gallery view, map pin handler, "Where they've been" profile section live coverage
36-07 Calendar polish — color-coded category dots + upcoming-date mock data wiring + empty-date state polish
36-08 Photo audit — sweep every mock data file, fix mismatched photos (founder flagged as demo-killer) pitch-critical

Open questions for next session

~30 design questions to lock before /gsd:plan-phase 36

All open questions are captured in .planning/phase-36-open-questions.md across 5 streams (US expansion, WC Hub V2, photo threading, profile linkage, palette+colors, photo audit, calendar polish, cross-cutting). Founder marks ⬜ → ✅ before /gsd:discuss-phase 36.

Already locked ✅: autonomy mode (autonomous: true), Phase 36 scope, US cities (LA + Austin), Variant C palette direction
Highest-leverage to answer:
  • Profile section name — "Where they've been" vs "On the ground" vs "Photos"?
  • Photo thread time decay — 24-hour auto-lock OK?
  • Calendar dot color mapping — 8 categories or fewer?
  • Per-city accent gradient mapping — confirm 10 city palette assignments?
  • Photo audit — keep Picsum or upload curated images for hero shots?

Everything to review (in priority order)

Next session — start here

When you come back

  1. 1. Open .planning/phase-36-open-questions.md — mark ⬜ → ✅ on the questions that matter
  2. 2. Run /gsd:discuss-phase 36 — Claude consumes your answers + asks clarifying follow-ups
  3. 3. Run /gsd:plan-phase 36 — writes the 8 plan files
  4. 4. Run /gsd:execute-phase 36 — ships autonomously, you review at end
Estimated wall-clock: 4-6 sessions to ship Phase 36 fully.